SMALL CIVIL WORKS


Document Ref. #Document DescriptionContact NameContact No.Deadline of Submission of Offer  
TSSD-RAD-2020-032 CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE FOR TOWER 29 ALONG SAN ESTEBAN - BANGUED 69KV LINE RONALD A. DALISTAN 091781024569/09/2020
PR 10048795_BIDDING 2 REFURBISHMENT OF GAMU-ROXAS 69 KV T/L MA. GRETA C. NACHOR 09178791700 8/24/2020
PR#10051207 CONSTRUCTION OF MECHANICAL SHOP FOR NLOM MTD-B. JOHN ELDON N. CALATRAVA 8-863-7100 8/19/2020
PR#10051058 SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF CCMS WORKSTATION AT MEXICO SS. JOHN ELDON N. CALATRAVA 8-863-7100 8/18/2020
PR#10051059 SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF CCMS WORKSTATION AT DASMARINAS SS. JOHN ELDON N. CALATRAVA 8-863-7100 8/18/2020
10049693 (REBID) CONSTRUCTION OF HEIGHTENED PERIMETER FENCE AT ZAMBOANGA SUBSTATION GERALDINE W. PEREGRINO 091787918928/18/2020
PR 10046226R3 ERECTION OF TOWER 131 (OLD 124), TYPE DS, DOUBLE CIRCUIT ON BORED PILE FOUNDATION ALONG SAN ESTEBAN - LAOAG 230KV LINES 1 AND 2 MARIA BERNADETTE S. ARANGUREN +6391785472628/17/2020
10049196 (REBID) FURNISHING OF MATERIALS, LABOR, EQUIPMENT & OTHER INCIDENTALS FOR THE CONSTRUCTION OF PARKING SHED AT VILLANUEVA SUBSTATION GERALDINE W. PEREGRINO 091787918928/17/2020
POD-MIN-DAM-2019-0069(REPOSTED) SUPPLY LABOR, TOOLS, MATERIALS, EQUIPMENT, ETC. FOR THE CONSTRUCTION OF PROPOSED CONCRETE BOUNDARY MARKERS FOR TOWER NO. 150 ALONG ZAMBOANGA-PITOGO 138 KV TRANSMISSION LINE DONOVAN A. MILLARE 091787917218/17/2020
POD-MIN-DAM-2019-0076(REPOSTED) SUPPLY LABOR, TOOLS, MATERIALS, EQUIPMENT, ETC. FOR THE CONSTRUCTION OF PROPOSED REMEDIAL MEASURES FOR THE DORRODED LEG/BASE OF TOWER NO. 175 ALONG NAGA(MIN)-ZAMBOANGA 138KV TRANSMISSION LINE 1 DUE TO DIRECT SOIL DONOVAN A. MILLARE 091787917218/17/2020
POD-MIN-DAM-2019-0077(REPOSTED) SUPPLY LABOR, TOOLS, MATERIALS, EQUIPMENT, ETC. FOR THE CONSTRUCTION OF PROPOSED REMEDIAL MEASURES FOR THE DORRODED LEG/BASE OF TOWER NO. 189 ALONG NAGA(MIN)-ZAMBOANGA 138KV TRANSMISSION LINE 1 DUE TO DIRECT SOIL DONOVAN A. MILLARE 091787917218/17/2020
POD-MIN-DAM-2019-0078(REPOSTED) SUPPLY LABOR, TOOLS, MATERIALS, EQUIPMENT, ETC. FOR THE CONSTRUCTION OF PROPOSED REMEDIAL MEASURES FOR THE DORRODED LEG/BASE OF TOWER NO. 202 ALONG NAGA(MIN)-ZAMBOANGA 138KV TRANSMISSION LINE 1 DUE TO DIRECT SOIL DONOVAN A. MILLARE 091787917218/17/2020